Correction made to DFO Pool Closures

DFO has issued another variation order that includes a correction and a clarification to the previous closures. The initial variation order included:                Waters of the Southwest Miramichi River surrounding the pump house located at N 46.86483, W 65.67698 (WGS 84) This has been removed and the correction included as:                             The waters of Renous […]